Phase I of improving and greening the drainage swale addresses the stormwater channel on both sides of the new concrete staircase. This project transformed the existing rock drainage channel into a green swale that includes grading, excavation, stabilizing check dam, sodding, perennial grasses and plugs, and native trees and shrubs.
Amount: $10,000